Period of the event
November - December 2020
The main difficulties: the packaging of the elements of the drilling rig must fully comply with the state standards governing the use of packaging when transporting to areas of the Far North.
The packaging process was carried out simultaneously with the disassembly of the drilling rig, in low temperature conditions and under tight deadlines.
The maximum number of people simultaneously involved in the packaging process was up to 14 people.
Results: The project was completed within the required time frame.
<
>
11 - 11
Packaging, labeling, and preparation ...
... to transport a new drilling rig of the echelon type